P-76 HULL CONVERSION

projects

DORIS performed FPSO P-76 hull conversion engineering carry over, in order to complete the detail design and classify the converted Hull.

 

The project mobilized all naval disciplines, project management, process, piping, instrumentation and automation, 3D modeling, safety, mechanical/HVAC, structure, electrical and telecom. DORIS  assisted PETROBRAS at the yard during conversion, construction, integration, commissioning, pre-operation for all hull systems.

Services provided by DORIS:

  • Engineering Management;
  • Detailed Engineering Carry-over;
  • As Built, Data-Book and Manuals;
  • 3D Modeling;
  • Interface Management
  • Assistance for Construction;
  • Hull Design Review Classification with DNV
  • Site Survey of Hull Completion & Topside Integration
P-76 HULL CONVERSION

Main characteristics:

  • Liquid Processing Capacity 151,000 bbl/d
  • Produced Water Treatment Capacity 151.000 bbl/d
  • Gas Flow and Treatment Capacity 7,000,000 sm3/d
  • Oil Storage Capacity 1,400,000 bbl
  • Water Depth 2,500 m
  • Location Santos Basin
  • Field Buzios III
  • Converted Hull Titan Aires
  • Ship Classification DNV
  • Length Over All 332,00 m
  • Moulded Breath 58,00 m
  • Draft (max/ min) 22.00 m / 7.90 m
  • Dead Weight 261.18 m