Across this FEED scope, DORIS achieved 10% cost saving compared to pre-FEED

Project outline

The Cameroon South gas fields, Sanaga, Kribi, are located 10 km Northwest and 13 km Southwest of Kribi town.

The main features of the project are:

  • 2x 17km long, 12” pipelines to connect existing Sanaga-1 offshore platform to onshore Bipaga CPF plant;
  • 19km long, 12’’ pipeline to transport the dry gas from onshore Bipaga CPF plant to the FLNGV;
  • Existing Sanaga-1 offshore platform, with 4 new gas wells, will act as a transfer HUB (revamping by Perenco);
  • New onshore Bipaga CPF to deliver gas, condensate and by-product LPG

Our Projects

Trion

Trion field

DORIS delivered SURF and Export Pipeline Pre-FEED and SURF FEED to this project. Project outline The...
Read More
Repsol

Block 29 Conceptual Engineering

DORIS delivered Conceptual Engineering for the Subsea Production System (SPS) & Subsea Umbilical,...
Read More
BONGA_SWA_FPSO

Bonga SWA FPSO

DORIS engineering carried out the Basic Engineering (FEED) of the BSWA FPSO topsides and hull, delivering...
Read More