DORIS achieved 10% cost saving compared to pre-FEED

The Cameroon South gas fields, Sanaga, Kribi, are located 10 km Northwest and 13 km Southwest of Kribi town.

The main features of the project are:

  • 2x 17km long, 12” pipelines to connect existing Sanaga-1 offshore platform to onshore Bipaga CPF plant;
  • 19km long, 12’’ pipeline to transport the dry gas from onshore Bipaga CPF plant to the FLNGV;
  • Existing Sanaga-1 offshore platform, with 4 new gas wells, will act as a transfer HUB (revamping by Perenco);
  • New onshore Bipaga CPF to deliver gas, condensate and by-product LPG

REACTIVITY, STRONG COLLABORATION, FIT-FOR-PURPOSE METHODOLOGY

Our Projects

BONGA_SWA_FPSO

BONGA SWA FPSO

Major cost savings and robust local content plan DORIS engineering carried out the Basic Engineering...
Read More
img-Yadana

YADANA - MCP PLATFORM

DORIS has performed the FEED, the Call For Tender and early Detailed Engineering for the MCP platform...
Read More
Breagh_Alpha

BREAGH ALPHA

Provision of Operations and Maintenance Management The Breagh Field is in Block 42/13a,...
Read More