Across this FEED scope, DORIS achieved 10% cost saving compared to pre-FEED
Project outline
The Cameroon South gas fields, Sanaga, Kribi, are located 10 km Northwest and 13 km Southwest of Kribi town.
The main features of the project are:
- 2x 17km long, 12” pipelines to connect existing Sanaga-1 offshore platform to onshore Bipaga CPF plant;
- 19km long, 12’’ pipeline to transport the dry gas from onshore Bipaga CPF plant to the FLNGV;
- Existing Sanaga-1 offshore platform, with 4 new gas wells, will act as a transfer HUB (revamping by Perenco);
- New onshore Bipaga CPF to deliver gas, condensate and by-product LPG