Moho-Bilondo Phase 1BIS

DORIS’ team was integrated in Total’s SPS Package Management team to manage the SPS Contractor. Project outline The Moho Nord joint development project includes two field developments, namely Moho Nord and Moho Bilondo Phase 1bis. Phase 1bis is a subsea tieback to Moho Bilondo FPU. It targets additional reserves in the southern portion, whereas Moho … Read more

Robin Rigg offshore wind farm

DORIS was awarded a Works Management Contract for this UK Round 1 offshore wind farm. Project outline The 174 MW Robin Rig offshore wind farm is located in the Irish Sea. The development of the Robin Rigg offshore wind farm constituted a number of major contracts let by E.ON. DORIS was awarded the ‘Works Management Contract’ to … Read more

Solan

DORIS performed FEED, detailed engineering of the integrated deck, tagged items procurement, construction and pre-commissioning support. Project outline The Solan field is located in Block 205/26a in the Faroe-Shetland Channel. The proposed Solan development targets the Solan reservoir and is located approximately 135 kilometres to the west south west of Shetland mainland and at a … Read more

Girassol Risers & Flowlines

DORIS was in charge of developing a novel riser concept, meeting the challenges of this deepwater development, the deepest ever off West Africa. Project outline This project was the deepest ever in 1998. Services delivered by DORIS The search for a versatile, reliable and cost effective solution opened the way to the Riser Tower Concept. … Read more

Bonga Southwest Aparo

DORIS performed the FEED of the Bonga SWA FPSO topsides and Hull. The FPSO design and specification were based on DORIS fit-for-purpose design rules. Project outline The Bonga Southwest Aparo field is located 12 km southwest of the Bonga Main field in the southern part of the Niger Delta, offshore Nigeria. The field lies 160 … Read more