Ichthys M08A & M06

Project

1
 
Market
2
 
Client
3
 
Location
4

DORIS performed the full Detailed Engineering of ICHTHYS FPSO Modules due to slugging issue

Ichthys gas field is located off the northern coast of Western Australia; block WA-285-P.

The Ichthys Offshore includes the following key elements:

  • A floating Central Processing Facility (CPF).
  • A Floating, Production, Storage and Offloading unit (FPSO).
  • An updating of two modules was necessary to cope with slugging issue at the FPSO arrival, which lead to process modifications on the CPF and upgrade of the FPSO receiving facilities.

SERVICES PROVIDED BY DORIS:

  • FPSO Process debottlenecking study
  • Update of overall FPSO safety studies
  • Basic & Detailed Engineering of Module 08A with FPSO slug catcher and liquid heaters
  • Update of the Module M06 due to MEG debottlenecking study

MAIN CHARACTERISTICS:

Water Depth: 235 to 275 m
FPSO oil product: 100,000 bopd of condensate per day at peak

M80A:

  • 450 lines
  • 14 piping stress CN
  • 122 special support
  • 2,620 t gross dry

M06:

  • 1,200 lines
  • 60 piping stress CN
  • 450 special support
  • 4,250 t gross dry

140,000 manhours
Planning risks mitigated by DORIS

Our Projects

Sanaga

Sanaga

DORIS achieved 10% cost saving compared to pre-FEED The Cameroon South gas fields, Sanaga, Kribi, are...
Read More
BONGA_SWA_FPSO

Bonga SWA FPSO

Major cost savings and robust local content plan DORIS engineering carried out the Basic Engineering...
Read More
img-Yadana

Yadana - MCP Platform

DORIS has performed the FEED, the Call For Tender and early Detailed Engineering for the MCP platform...
Read More