DORIS performed FEED, detailed engineering of the integrated deck, tagged items procurement, construction and pre-commissioning support.
Project outline
The Solan field is located in Block 205/26a in the Faroe-Shetland Channel. The proposed Solan development targets the Solan reservoir and is located approximately 135 kilometres to the west south west of Shetland mainland and at a depth of 135m.
- Oil processing facilities
- Water lift, treatment & injection
- Utilities
- Living Quarters & aluminium helideck
Services delivered by DORIS
Following the completion of the FEED and cost reduction programme, DORIS proceeded with the detailed design stage of the project, working as a subcontractor to Burnstisland Fabrications Ltd. who have been awarded the EPC contract for the Solan Topsides integrated deck.
DORIS was responsible under the subcontract for the detailed engineering and design of the integrated deck, tagged items procurement, construction and pre-commissioning support. DORIS performed the design using PDMS 3D modelling throughout including the full structural design.