DORIS was engaged to define, assess and select the development concept.

Project outline

This project focused on the development, installation and operation of a large-scale renewable energy production facility (1 MPTA NH3) located near Geraldton, Western Australia. The facility had 2 GW PEM Electrolysers.

Services delivered by DORIS

DORIS’ scope of work included the following steps :

  • Define the building blocks and their key characteristics
  • Wind data acquisition, interpretation and analysis
  • Determine the technical requirements for each building block and their unit costs (CAPEX & OPEX)
  • Develop the techno-economic model
  • Select and optimise the preferred concept based on technical, cost, execution timeline, risk & opportunities evaluation

Our Projects

DORIS_Markets_NewEnergies_CarbonCapture_@VladimirAnikeev_Unsplash

SeaQuester Offshore CCS System

DORIS delivered conceptual process design for the carrier vessel in this offshore CCS system. Project...
Read More
3d molecules of water concept background

Onshore H2 Distribution Station

DORIS delivered engineering across this 5 MW PEM Electrolysers facility. Project outline The project...
Read More
Gas,Turbine,Electrical,Power,Plant,With,In,Twilight,Power,For

Infrastructure Victoria Net Zero Emission Study

DORIS undertook engineering forecast analysis for this emission study. Project outline The project...
Read More