DORIS performed project management, detailed engineering and operations engineering of the heaviest platform in the world.

Project outline

  • Total diameter 105 m
  • Total height GBS + deck 150 m
  • Total height GBS 110 m
  • GBS weight 1.4 million t
  • Deck size 98×34 m
  • Total operating load 60,000 t
  • Payload at final tow 39,000 t
  • Total volume of concrete 165,000 m3
  • Weight of reinforcing steel 85,000 t
  • Weight of prestressing steel 5,000 t
  • No. of conductors 64
  • No. of risers 4
  • No. of J-tubes 13

Providing oil drilling, storage and production, Hibernia is also the first iceberg resistant platform. It can resist the impact of an iceberg having a mass of more than 4 million tonnes and drifting at a speed of up to 1.35 m/s. The anti-ice wall consists of a series of triangular teeth regularly distributed on the circumference of the GBS.

Services delivered by DORIS

Across 2.5m manhours, DORIS delivered:

  • Project management
  • Detailed engineering
    • Concrete: structural, dynamic and earthquake analyses, design of concrete components in temporary and in operating conditions
    • Foundation including 3D finite element analysis
    • Mechanical outfitting: temporary and permanent systems
  • Marine operations
    • BS moorings
    • Float-out from dry dock
    • GBS ballasting during afloat construction
    • Topsides load-out, transportation and mating
    • Final tow to field and installation
    • Offshore works including underbase grouting and solid ballasting

Our Projects

Trion

Trion field

DORIS delivered SURF and Export Pipeline Pre-FEED and SURF FEED to this project. Project outline The...
Read More
Repsol

Block 29 Conceptual Engineering

DORIS delivered Conceptual Engineering for the Subsea Production System (SPS) & Subsea Umbilical,...
Read More
Sanaga

Sanaga

Across this FEED scope, DORIS achieved 10% cost saving compared to pre-FEED Project outline The Cameroon...
Read More