Moho-Bilondo FPU

DORIS has developed the FEED and the Detailed Engineering of the FPU Topsides, and performed the EPCI of the mooring system The Moho & Bilondo reservoirs lie 1750 m to 4100 m below the mud line in water depth ranging from 600 m to 900 m. DORIS designed a Floating Production Unit (FPU) moored in … Read more

SHWE

DORIS delivered FEED and early detailed of 25,000 ton Topsides, 20,600 ton Jacket and FEED of pipelines network. Project outline The Shwe development consists of a Drilling and Central Production Platform, single platform installation by float-over concept. Mya field was developed from two subsea drilling centres, Mya North in 196 m of water depth and … Read more

Moho-Bilondo Phase 1BIS

DORIS’ team was integrated in Total’s SPS Package Management team to manage the SPS Contractor. Project outline The Moho Nord joint development project includes two field developments, namely Moho Nord and Moho Bilondo Phase 1bis. Phase 1bis is a subsea tieback to Moho Bilondo FPU. It targets additional reserves in the southern portion, whereas Moho … Read more

Solan

DORIS performed FEED, detailed engineering of the integrated deck, tagged items procurement, construction and pre-commissioning support. Project outline The Solan field is located in Block 205/26a in the Faroe-Shetland Channel. The proposed Solan development targets the Solan reservoir and is located approximately 135 kilometres to the west south west of Shetland mainland and at a … Read more

Girassol Risers & Flowlines

DORIS was in charge of developing a novel riser concept, meeting the challenges of this deepwater development, the deepest ever off West Africa. Project outline This project was the deepest ever in 1998. Services delivered by DORIS The search for a versatile, reliable and cost effective solution opened the way to the Riser Tower Concept. … Read more