Formosa 2 offshore wind farm

Project

1
 
Market
3
 
Location
4

DORIS provided consultancy services to client Formosa 2 across this offshore wind project.

Project outline

The Formosa 2 offshore wind farm project is located in the Taiwan Strait and is being jointly developed by JERA (49%), Macquarie’s Green Investment Group (26%) and Swancor Renewable Energy (25%). It consists of 47 x 8 MW WTGs (376 MW) installed on pre-piled jacket foundations.

Services delivered by DORIS

DORIS’ services extend from preparation and management of tenders through to contract signature of main EPCI packages, primarily including:

  • WTG Technical and Commercial Package Management
  • Foundations Design Engineering Management
  • Site Investigation Campaign (Geotechnical and Geophysical) Technical and Commercial Management
  • Certification Services Technical and Commercial management

Our Projects

EA1 Wind Farm

Gray Whale 3 floating offshore wind farm

DORIS is delivering two FEED contracts across this floating offshore wind project for BadaEnergy. Project...
Read More
20210706_Wind_Park

Codling offshore wind park

DORIS was selected as Owner’s Engineer for the concept and feasibility stages of this development. Project...
Read More
outer-dowsing-offshore-wind-farm

Outer Dowsing offshore wind farm

With extensive experience across all rounds of the UK offshore wind industry, DORIS delivered Owner’s...
Read More