DORIS provided consultancy services to client Formosa 2 across this offshore wind project.
Project outline
The Formosa 2 offshore wind farm project is located in the Taiwan Strait and is being jointly developed by JERA (49%), Macquarie’s Green Investment Group (26%) and Swancor Renewable Energy (25%). It consists of 47 x 8 MW WTGs (376 MW) installed on pre-piled jacket foundations.
Services delivered by DORIS
DORIS’ services extend from preparation and management of tenders through to contract signature of main EPCI packages, primarily including:
- WTG Technical and Commercial Package Management
- Foundations Design Engineering Management
- Site Investigation Campaign (Geotechnical and Geophysical) Technical and Commercial Management
- Certification Services Technical and Commercial management