Yadana – MCP Platform

DORIS performed the FEED, the Call For Tender and early Detailed Engineering for the MCP platform of Yadana. Project outline The MP Compression Platform (MCP) is connected by bridge to the existing Production Platform (PP) and to the future LCP Platform. The objective of MCP is to maintain the Gas Sales Production whileWellhead Flowing Pressure … Read more

SHWE

DORIS delivered FEED and early detailed of 25,000 ton Topsides, 20,600 ton Jacket and FEED of pipelines network. Project outline The Shwe development consists of a Drilling and Central Production Platform, single platform installation by float-over concept. Mya field was developed from two subsea drilling centres, Mya North in 196 m of water depth and … Read more