Vapour Recovery Unit Pilot Concept Design

Consulting

Project

1
 
Category
Decarbonisation, Energy Sector, Methane Management, Methane Mitigation
2
 
Themes
Flaring Reduction, Investment & Financing, Methane Mitigation
3
 
Services
Cost Estimation, Reports, Risk & Opportunity Assessment, Technology Assessment, Techo-economic analysis
4
 
Client
World Bank
5
 
Location
Kazakhstan
6

DORIS delivered concept-level engineering to assess the feasibility of vapour recovery solutions for reducing flaring and venting emissions.

Project outline


The Vapour Recovery Unit (VRU) Pilot Concept Design evaluated technical options to capture and monetise hydrocarbon vapours currently flared or vented. The objective was to define a technically feasible and commercially viable pilot solution to demonstrate emissions reduction potential.

Services delivered by DORIS


DORIS developed concept-level engineering designs for a pilot vapour recovery unit, including process configuration, equipment sizing and integration with existing facilities. The study evaluated technical feasibility, operational constraints and safety considerations associated with retrofitting capture systems.


High-level capital and operating cost estimates were prepared, supported by techno-economic analysis to assess payback potential and emissions reduction impact. Implementation risks and regulatory considerations were identified, and alternative configurations were compared. 


The outcome provided a robust basis for progressing to detailed design and investment approval, demonstrating how flaring and venting emissions could be reduced while generating commercial value.

Discover more Consulting projects

See more

Our Projects

Case_Study_10_Main

Independent  Project Review for Renewable Energy Microgrid

DORIS provided independent technical review to assess the robustness and bankability of a renewable energy...
Read More
Case_Study_6_Main

Methane Measurement Roadmap

DORIS developed a national methane measurement roadmap to guide phased investment in monitoring technologies...
Read More
Case Study 4_Main

Corporate Emissions Management Strategy

DORIS developed a corporate-level methane management framework aligned with international best practice...
Read More