SHWE

FEED and early detailed of 25,000 ton Topsides, 20,600 ton JacketFEED of pipelines network Development at Shwe consists of a Drilling and Central Production Platform, single platform installation by float-over concept. Mya field was developed from two subsea drilling centres, Mya North in 196 m of water depth and future Mya South in 600 m … Read more