SANAGA

success stories

DORIS achieved 10% cost saving compared to pre-FEED

The Cameroon South gas fields, Sanaga, Kribi, are located 10 km Northwest and 13 km Southwest of Kribi town.

The main features of the project are:

  • 2x 17km long, 12” pipelines to connect existing Sanaga-1 offshore platform to onshore Bipaga CPF plant;
  • 19km long, 12’’ pipeline to transport the dry gas from onshore Bipaga CPF plant to the FLNGV;
  • Existing Sanaga-1 offshore platform, with 4 new gas wells, will act as a transfer HUB (revamping by Perenco);
  • New onshore Bipaga CPF to deliver gas, condensate and by-product LPG

SANAGA
SANAGA
  • DORIS design allowed 10% CAPEX decrease
  • Weight savings, layout optimization, equipment list reduction
SANAGA
  • Fast track FEED
SANAGA
  • Planning risk mitigated
  • Excellent cooperation between Client Perenco and DORIS in a joint team

Reactivity, strong collaboration, fit-for-purpose methodology