SANAGA
Project
OUR SUCCESS STORIES
success stories
The Ichthys Offshore includes the following key elements:
• A floating Central Processing Facility (CPF).
• A Floating, Production, Storage and Offloading unit (FPSO).
An updating of two modules was necessary to cope with slugging issue at the FPSO arrival, which lead to process modifications on the CPF and upgrade of the FPSO receiving facilities.
DORIS worked on a multi-site mode, between France and South-Korea.