BREAGH ALPHA

projects

Provision of Operations and Maintenance Management

 

The Breagh Field is in Block 42/13a, approximately 110 Km east of Teesside in 62metres water depth.
The Breagh Alpha platform was installed in October 2011, gas production commenced in October 2013.
The Breagh A is a 12 slot Minimum Facilities Normally Unattended well platform that comprises a piled steel jacket supporting topsides and a helideck.

BREAGH ALPHA

Services provided by ODE:

Pre-Start up:

  • Provided consultancy on operability, maintainability and layout during basis of design development stage
  • Offshore O&M personnel on site at EPC yard during yard construction
  • Developed maintenance and integrity management system for topsides and subsea
  • Completed flowline hook-up fabrication and installation
  • Provided commissioning and start-up support

Asset Management :

  • Onshore/Offshore Ops and Maintenance Support Personnel
  • Onshore Base Support Facilities.
  • Development and implementation of a computer-based Maintenance and Integrity Management System (CMMS), including:
    — Development and implementation of inspection and maintenance strategies in line with the requirements of the Breagh Alpha South Safety Case, written Scheme of Examination and Performance Standards
    — Development and implementation of topsides and subsea inspection, maintenance and testing schedules
    — Planning of maintenance and history/performance analysis and reporting
  • Operational Spares inventory recommendation / storage
  • Intervention visit planning and execution
  • Day-to-day monitoring of field operations and liaison with INEOS operations interfaces
  • Mobilisation of unplanned reactive intervention visit
  • Logistics interfaces management
  • Day-to-day Breagh Field materials/services procurement support
  • Materials movement management
  • Project