Bonga SWA FPSO

success stories

Major cost savings and robust local content plan

DORIS engineering carried out the Basic Engineering (FEED) of the BSWA FPSO topsides and hull. The design dossier has been developed to launch an open competition between new built and intercept/conversion ship. The FPSO Design and specification was based on DORIS Fit For Purpose Design Rules and Industry Codes and Standards.

Bonga SWA FPSO
Bonga SWA FPSO
  • DORIS design allowed considerable decrease of the CAPEX
  • Thanks to our “Fit-For-Purpose” methodology
  • Weight savings, layout optimization, equipment list reduction
Bonga SWA FPSO
  • Our local content plan allowed the FEED to be delivered on time
  • Thanks to our design optimizations, the project schedule is reduced
Bonga SWA FPSO
  • Our CAPEX decrease contributes to make the project feasible and viable

Robust local content plan, strong collaboration between our teams in Lagos and Paris

  • Project

Privacy Preference Center

Necessary

Advertising

Analytics

Collects navigation data on the site

_ga,_gat_UA-138076199-1,_gid

Other