28/04/2019
DORIS provided CAPEX and OPEX optimisations for BONAPARTE FLNG
read more
28/04/2019
DORIS achieved 10% cost saving compared to pre-FEED
read more
28/04/2019
DORIS optimized the Pre-Project Dossier
read more
28/04/2019
DORIS performed engineering and design work at basic level required for whole FPSO based on DORIS DVLHS concept
read more